Tenon Base Rail — Assembly instructions
Tools needed: drill, pencil, spirit level, screwdriver
Material needed: wall plugs suitable for your wall, countersunk screws with a head width of max. 4 mm (not included). The screw length depends on the plug you choose — follow the plug manufacturer's specifications.
1. Choose the position and check the wall
Choose the position you want for the base rail. Tap the wall at that spot to determine its structure (e.g. concrete, brick, plasterboard) — this decides which plug is suitable.
2. Mark the holes
Mark the position of the upper hole. Using a spirit level, measure 360 mm straight down (center to center) and mark the lower hole.
3. Drill and insert the plugs
Drill both holes and insert the matching plugs.
4. Fix the lower spacer
Screw the lower spacer to the wall with a countersunk screw (max. 4 mm head width, length to match the chosen plug).
5. Finish mounting the spacers
Screw the upper spacer to the wall with a suitable countersunk screw as well. For both spacers (top and bottom), place the plastic washer between the spacer and the base rail and screw the rail on with it.
6. Load test
Check the installation with a light load test before you use the system.
Safety note: Do not use Tenon if it has not been mounted correctly or the wall is not suitable. Maximum load: 1.5 kg.